 sale2@hdwaterjet.com      008615942048409

"Unmanned" Cutting Core Zone! Integrated Waterjet Cutting System Maintenance Manual for Sound-Insulated Rooms

Views: 0     Author: Site Editor     Publish Time: 2025-06-10      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

crop_1745482950923

Introduction

This comprehensive maintenance manual outlines the operational and upkeep procedures for our state-of-the-art, integrated waterjet cutting system, designed for unmanned operation within a sound-insulated room. This system features an enclosed robotic arm and positioner workstation, with all auxiliary components—including the pump, abrasive supply, abrasive removal system, and water tank—fully integrated inside the quiet enclosure. This manual aims to ensure safe, efficient, and continuous operation, maximizing the lifespan and performance of your investment.

Safety First: Essential Guidelines

Operating within an unmanned core cutting zone necessitates strict adherence to safety protocols. While the system is designed for minimal human intervention during operation, maintenance procedures require careful attention.

  • Authorized Personnel Only: Only trained and certified technicians should perform maintenance tasks.

  • Lockout/Tagout Procedures: Always follow strict lockout/tagout (LOTO) procedures before beginning any maintenance, cleaning, or inspection work. Ensure all power sources are disconnected and de-energized.

  • Personal Protective Equipment (PPE): Always wear appropriate PPE, including safety glasses, hearing protection, gloves, and protective footwear, especially when working with high-pressure components or abrasive materials.

  • High-Pressure Hazards: Be aware of residual pressure in the system. Never attempt to loosen fittings or disassemble components while the system is pressurized.

  • Abrasive Handling: Wear masks and gloves when handling abrasive material to prevent inhalation and skin irritation.

  • Emergency Stop: Familiarize yourself with the location and operation of all emergency stop buttons.

  • Confined Space Entry: If the sound-insulated room is classified as a confined space, adhere to all relevant confined space entry protocols.

System Overview

The integrated waterjet cutting system is designed for high-precision cutting in a controlled, unmanned environment. Key integrated components within the sound-insulated room include:

  • Robotic Arm & End Effector: Performs precise cutting movements.

  • Workstation & Positioner (or Turner): Secures and manipulates the workpiece for optimal cutting angles.

  • High-Pressure Pump: Generates the extreme water pressure for cutting.

  • Abrasive Delivery System: Stores and feeds abrasive (e.g., garnet) to the cutting head.

  • Cutting Head: Mixes water and abrasive for the cutting jet.

  • Catcher Tank: Collects spent water and abrasive.

  • Abrasive Removal System (ARS): Continuously removes spent abrasive from the catcher tank.

  • Water Filtration & Recycling System: Cleans and reuses water (if applicable).

  • Control Cabinet: Houses the main electrical and control components.

  • Sound-Insulated Room: Provides acoustic isolation for the entire cutting operation.


  • 集装箱 机械臂 整体切割方案 本特勒 (13) (3)

Daily Maintenance Checks (Before/After Production)

Perform these checks daily to ensure optimal performance and identify potential issues early.

  • Visual Inspection of Enclosure: Check the sound-insulated room for any signs of damage, leaks, or compromised seals. Ensure doors close properly to maintain acoustic integrity.

  • Robotic Arm & Workstation:

    • Inspect for any visible damage, loose cables, or obstructions.

    • Confirm smooth movement of the robotic arm and positioner.

  • Nozzle & Orifice:

    • Visually inspect the cutting nozzle and orifice for wear or damage. Replace as needed.

    • A worn nozzle can significantly reduce cutting efficiency and accuracy.

  • Abrasive Levels: Check the level of abrasive in the hopper. Refill if necessary.

  • Water Levels: Check water levels in the main tank and ensure proper filtration is occurring.

  • Catcher Tank: Visually inspect the catcher tank for excessive buildup of spent abrasive, though the ARS should minimize this.

  • Pump & Hoses: Listen for unusual noises from the high-pressure pump. Check high-pressure lines and fittings for any signs of leaks.

  • Control Panel: Verify all indicators are normal and no fault codes are displayed.

Weekly Maintenance Tasks

These tasks go beyond daily checks and address potential wear and tear.

  • Abrasive Removal System (ARS) Check:

    • Inspect ARS components (e.g., augers, conveyors, filters) for wear or blockages.

    • Ensure effective removal of spent abrasive from the catcher tank.

  • Water Filtration System:

    • Clean or replace water filters as per manufacturer's recommendations.

    • Check water quality parameters if a recycling system is in place.

  • Lubrication: Lubricate robotic arm and positioner joints/bearings according to manufacturer specifications.

  • Fasteners: Inspect all accessible bolts and fasteners on the robotic arm, workstation, and major system components. Tighten as needed.

  • Electrical Connections: Visually check electrical connections in the control cabinet for looseness or corrosion (ensure LOTO).

Monthly Maintenance Procedures

More in-depth checks and preventative measures.

  • High-Pressure Pump Inspection:

    • Check pump oil levels and condition. Change oil as per manufacturer's guidelines.

    • Inspect plungers, seals, and check valves for wear or damage.

    • Check drive belts (if applicable) for tension and wear.

  • Cutting Head Disassembly & Cleaning:

    • Disassemble the cutting head (under LOTO) and thoroughly clean all internal components.

    • Inspect mixing tubes for wear and replace if necessary.

  • Abrasive Hopper Cleaning: Empty and clean the abrasive hopper to remove any foreign particles or clumps.

  • Catcher Tank Cleanout: Periodically (or as indicated by ARS performance) perform a thorough manual cleanout of the catcher tank to remove any residual sludge that the ARS might miss.

  • Calibration Check (Robotic Arm/Positioner): Perform a basic calibration check of the robotic arm and positioner to ensure positional accuracy. Refer to the robot manufacturer's specific instructions.

Annual/Bi-Annual Major Servicing

These are comprehensive service intervals, often requiring specialized technician support.

  • Pump Overhaul: Complete overhaul of the high-pressure pump, including replacement of all seals, plungers, and check valves.

  • Robotic Arm & Positioner Full Service: Comprehensive inspection and service of the robotic arm and positioner, including bearing checks, backlash adjustments, and software updates.

  • System Calibration: Full system recalibration to ensure optimal cutting accuracy and alignment.

  • Component Replacement: Proactive replacement of wear parts, such as high-pressure tubing, fittings, and specific ARS components, based on operating hours and wear indicators.

  • Structural Integrity Check: Inspect the structural integrity of the workstation and sound-insulated room for any long-term fatigue or corrosion.

  • Electrical System Check: Comprehensive inspection of the entire electrical system, including wiring, circuit breakers, and safety interlocks.

Troubleshooting Guide (Common Issues)

Problem Possible Cause Solution
No Water Pressure Low water supply, clogged filter, pump malfunction, burst hose Check water supply, clean filter, inspect pump (call service), inspect hoses
Poor Cut Quality Worn nozzle/orifice/mixing tube, incorrect pressure, abrasive issues, robot path error Replace worn parts, adjust pressure, check abrasive flow/quality, recalibrate robot
Abrasive Not Flowing Clogged abrasive line, wet abrasive, empty hopper Clear blockage, use dry abrasive, refill hopper
Excessive Noise Worn pump components, air leaks, damaged enclosure seals Inspect pump, check for air leaks, repair enclosure seals (call service for pump)
Robot Movement Error Obstruction, programming error, mechanical issue Clear obstruction, verify program, check for loose parts (call service)
Water Leakage Loose fittings, damaged seals, punctured hose Tighten fittings, replace seals, replace hose
ARS Malfunction Motor issue, conveyor blockage, sensor fault Inspect motor, clear blockage, check sensors (call service)

Record Keeping

Maintain detailed records of all maintenance activities, including:

  • Date of service

  • Technician performing the service

  • Description of work performed

  • Parts replaced

  • Any issues identified and resolutions

  • Readings from pressure gauges or other relevant meters

This documentation is vital for tracking component lifespan, planning future maintenance, and troubleshooting recurring issues.


By adhering to the guidelines in this manual, you can ensure the safe, efficient, and extended operation of your unmanned waterjet cutting system within its sound-insulated room, maintaining high productivity and quality standards for your manufacturing processes.


As Head has a strong research and development, production sales and service team, Shenyang Head Science and Technology Co.,Ltd has become well-known enterprises in waterjet cutting machine manufacturer field.

QUICK LINK

CONTACT

Address:NO.110-3,Hongrun Road, Yuhong District, Shenyang City
Tel:024-31063117
Phone:+86 159 4204 8409
After-sales Service Phone : +86 135 9191 9230
E-mail:
sale2@hdwaterjet.net
Leave a Message
Contact us
Copyright © 2018 Shenyang Head Science & Technology Co.,Ltd All rights reserved. Sitemap